Projects
Year | Project Name | Job Description | Location | Client | |
---|---|---|---|---|---|
1 | On going | RAPP TG10 FL3B Project | Mechanical and Piping Work | Pelalawan, Riau, East Sumatra | PT. Riau Andalan Pulp and Paper(RAPP) |
2 | On going | Jawa 9&10 CFPP Project | Mechanical works such as Turbine, CHS, AHS, BOP Mechanical and Piping | Suralaya, Banten, Indonesia | PT. Doosan Heavy Industries Indonesia |
3 | On going | Kalselteng-2 CFSPP 2 x 100MW Project |
| Asam-asam, Kalimantan, south Kalimantan, Indonesia | Hyundai Engineering (HEC) |
4 | On going | Muara Tawar Blok 2, 3, 4 add on CCPP 650MW | Mechanical Erection of HRSG, STG and BOP Equipment & Piping | Babelan, Bekasi, West Java, Indonesia | PT. Hutama Karya (Persero) |
5 | On going | Indonesia Tanjung Jati 5 & 6 2 x 1000MW CFPP Project | Boiler mechanical erection work | Tanjung Jati, Kembang District, Jepara Regency, Central Java Province, Indonesia. | Sumitomo Corp. |
6 | 2020 | Lombok 2 x 50MW CFB Boiler PP(U/G) | Under Ground Piping Work | PT. Rekayasa Industri | |
7 | 2019 | Muara Laboh Geothermal Power Project 1 x 88MW | Mechanical & piping installation work (package inside power plant) | Muara Laboh, South Solok, West Sumatra Province, Indonesia | PT. Rekayasa Industri |
8 | 2019 | Installation of GIS 150 KV Gell 130 – 150MW Lombok | Electrical works | Tanjung Karang Urban Village, Mataram City, West Nusa Tenggara, Indonesia | PT. PP(Persero)TBK |
9 | 2019 | Lumut Balai 1 – 1 x 55MW GPP | Mechanical STG, E&I, insulation works, Piping, painting and mechanical work for BOP area, Package 1: FCRS piping | Lumut Balai Hill,semendo darat, muara enim south sumatera | Marubeni Corporation & PT. Inti Karya Pesada Teknik (IKPT) |
10 | 2017 | Ulubelu Geothermal Project Lampung | Mechanical work | Ulubelu, Tanggamus, Lampung, Indonesia | PT. Rekayasa Industri |
11 | 2015 | Babelan Project | Fabrication & installation gantry & rail beam Pt. Cikarang Listrindo | Cikarang, West Java, Indonesia | PT. Sumber Intan Lestari |
12 | 2015 | STG & Coal Boiler Pusri Palembang | Underground piping work & RWI pipe | Sei Selayur, Kalidoni, Palembang City, South Sumatra, Indonesia | PT. Rekayasa Industri |
13 | 2012 | Tanjung Jati B 2 x 660MW Unit 3 & 4 Expansion Project | – Erection works for 2 units of condensers & LP heaters, critical and STG piping packages – Mechanical E&I installation and erection work for 2 units of coal fired boilers | Tanjung Jati, Kembang District, Jepara Regency, Central Java Province, Indonesia. | Sumitomo Corp. |
14 | 2011 | Muara Tawar 225MW Block 5 Extension Project | Balance of plant EPC, erection work of HRSG, 160MW GTG, 65 MW STG, condenser | Segara Jaya village, Taruna Jaya sub-district, Bekasi, West Java | Marubeni Corp |
15 | 2011 | Paiton Expansion Project 815MW CFPP After Boiler Hydro | Mechanical piping work for after boiler hydro piping | Probolinggo, East Java, Indonesia. | Mitsui-MHI |
16 | 2010 | Cikarang Listrindo 128MW STG & Condenser | Cikarang Listrindo phase VC 1 x 128 MW STG generator and condenser installation | Cikarang, West Java, Indonesia | PT. Cikarang Listrindo |
17 | 1999 | Cikarang Listrindo 2 x 62MW STG and Piping Project | Erection work for 2 units of steam turbine generator & auxiliaries | Cikarang, West Java, Indonesia | Nichimen Corp. |
18 | 1997 | Paiton Power House Project Phase I Conveyor | Supply and fabrication of conveyor structure | Probolinggo, East Java, Indonesia. | Shintoa Corp. |
19 | 1997 | Paiton 2 x 610MW Unit 5 & 6 Power House Project Phase II | Installation, commissioning and maintenance of complete site power distribution system | Probolinggo, East Java, Indonesia. | Siemens AG |
20 | 1997 | Paiton 2 x 610MW Unit 5 & 6 Power House Project Phase II | :- Erection of 2 x 610MW boilers (1,220 MW) – Fabrication and erection of 2 units of 615MW coal fired boiler (1,230MW) | Probolinggo, East Java, Indonesia. | ABB-CE Int’l., Inc. |
Year | Project Name | Job Description | Location | Client | |
---|---|---|---|---|---|
1 | On going | Linde Air Separation Plant (ASU) Java | Mechanical Electrical Instrument Package | Manyar, Gresik, East Java | PT. Linde Indonesia |
2 | On going | Manyar Smelter Plant Project | Steel Structure Erection Area D Piping Fabrication and Erection Area A and D | Manyar, Gresik, East Java | PT. Chiyoda International Indonesia |
3 | On going | Lotte Indonesia New Ethylene Complex (LINEC) | Underground Piping Work | Cilegon, Banten, West Java | PT. Hein Global Utama |
4 | On going | RDMP RU-V Balikpapan Project | Steel Structure Mechanical Erection PKG 03 (Mechanical Work) Piping Work PKG-05 Steel Structure Erection PKG -1&5 Mechanical Erection PKG-05 | Balikpapan, East Kalimantan, Indonesia | RDMP Balikpapan JO (Hyundai Engineering (HEC), PT. Rekayasa Industri (Rekind) & PT. PP) |
5 | 2021 | NSI 3A Expansion Project – (Package 1: Piping) | Piping work | Cilegon, Banten, Indonesia | PT. Inti Karya Pesada Teknik (IKPT) |
6 | 2020 | Butene 1 & MTBE Project | Piping work | Cilegon, Banten, Indonesia | PT. Inti Karya Pesada Teknik (IKPT) |
7 | 2019 | New Polythylene Project 400 KTA HDPE LLDPE | Steel structure for pipe rack & piping Package 2 with common scaffolding | Cilegon, Banten, Indonesia | PT. Inti Karya Pesada Teknik (IKPT) |
8 | 2018 | 120 KTA Synthetic Rubber U-3 | Above ground piping and painting works PKGE-3 | Cilegon, Banten, Indonesia | PT. Synthetic Rubber Indonesia – IKPT |
9 | 2018 | Banggai Ammonia Plant | Utility piping fabrication & installation | Banggai, Luwuk, Central Sulawesi, Indonesia | PT. Rekayasa Industri |
10 | 2016 | New Ethylene Bosster Compressor Project Cilegon | EPC for civil, mechanical, electrical and instrument work | Cilegon, Banten, Indonesia | PT. Styrindo Mono Indonesia |
11 | 2015 | CAPECCx Project PT. Chandra Asri Petrochemical Cilegon | Steel structure, mechanical, piping (WT & WWT area) | Cilegon, Banten, Indonesia | Toyo Engineering |
12 | 2014 | SSP Mechanical & Piping Installation Bogor | Mechanical installation, install piping system, repair ducting, sprinkler system SSP process building utility pipe | Citeureup, Bogor, West Java, Indonesia | PT. Indokordsa Tbk |
13 | 2014 | IHI Tigar 50 TPD Coal Gasification Prototype Plant Construction Karawang | Mechanical, piping, electrical & instrument works | Cikampek, West Java, Indonesia | IHI Corporation |
14 | 2014 | Kaltim-5 Urea Area Piping Work at PT. Pupuk Kalimantan Bontang, East Kalimantan | Piping aboveground urea area | Bontang, East Kalimantan, Indonesia | IKPT-Toyo |
15 | 2013 | Export Grade Alcohol (EGRA) Plant construction at PT. Indolampung Distilery, Lampung, Sumatera | Piping works, installation scaffolding, steel structure, and mechanical works | North Sumatra, Indonesia | Sugar Group Companies |
16 | 2013 | i-II Project Piping Work for 2AA Plant at PT. Nippon Shokubai Indonesia, Cilegon | Piping works | Cilegon, Banten, Indonesia | Toyo Engineering Global |
17 | 2012 | MOP Project Package IV 25 ton Ladle Furnace at Antam Pomalaa FeNi 3 Plant, Kolaka, Sulawesi | Erection works | Central Sulawesi, Indonesia | PT. Antam Tbk |
Year | Project Name | Job Description | Location | Client | |
---|---|---|---|---|---|
1 | 2015 | Improvement HP Ethylene Pipeline at Ragas | Piping & piling work | Ragas Brigde, Kampung Ragas – Bojonegoro, Banten, Indonesia | PT. Chandra Asri Petrochemical |
2 | 2014 | Civil & Building Work Tigar 50 TPD Prototype Plan Pupuk Kujang | Construction of buildings, foundation, exterior structure, & other civil works | Cikampek, West Java, Indonesia | IHI Corporation |
3 | 2013 | EGRA Plan PT. ILD Lampung | Civil foundation works | Lampung, Indonesia | PT. Indo Lampung Distilery |
4 | 2012 | Civil & Building Works MOP FeNi Project, Antam Pomala | Civil & building works at the site | Central Sulawesi, Indonesia | PT. Aneka Tambang (Persero) Tbk |
Year | Project Name | Job Description | Location | Client | |
---|---|---|---|---|---|
1 | On Going | 1st Major Maintenance Central Java Project | Exception of overhaul, inspection & maintenance work of boiler and turbine | Ujungnegoro, Kandeman District, Batang Regency, Central Java | PT. Power Systems Service Indonesia |
2 | On Going | 1st Major Maintenance Tanjung Jati Power Station Project Unit 5 | Exception of overhaul, inspection & maintenance work of boiler | Jepara, Central Java | PT. Power Systems Service Indonesia |
3 | 2018 | GT 11-C Inspection PT. CEPA | Inspection, insulation and replacement shut off valve | Sengkang, South Sulawesi, Indonesia | PT. Consolidated Electric Power Asia |
4 | 2015 | Chandra Asri Petrochemical GTG Hot Gas Path Inspection | Mechanical work of GE gas turbine generator | Cilegon, Banten, Indonesia | PT. Alstom PES Indonesia |
5 | 2015 | TAM 2015 |
| Cilegon, Banten, Indonesia | PT. Chandra Asri Petrochemical |
6 | 2015 | Patuha 1st Year Inspection Maintenance | Modification work, material supply for RM PCV maintenance, installation work pitot tube | Ciwidey district, Bandung regency, west Java island, Indonesia | Marubeni Corporation |
7 | 2014 | Install Redundancy Line EHOH and BUOH PT. CAP Jetty A to Jetty B | Piping work | Cilegon, Banten, Indonesia | PT. Chandra Asri Petrochemical |
8 | 2013 | GT 12 (GT8C) C Inspection & Generator Limited Overhaul in Sengkang Combined Cycle Power Plant | C inspection & generator limited overhaul | Sengkang, South Sulawesi, Indonesia | PT. Consolidated Electric Power Asia |
9 | 2013 | Alstom TP 2013 – M & E Rewinding Work Generator Stator and Field Inspection Major Overhaul of DSS Serang Project | M & E rewinding work generator stator and field inspection major overhaul | Serang, Banten, Indonesia | PT. Alstom PES Indonesia |
10 | 2013 | MI GE Gas Turbine Unit #2, Mechanical Major Inspection Gas Turbine, Stator & Rotor Generator Inspection & Replacement | Mechanical major inspection gas turbine, stator & rotor generator inspection & replacement | Cikarang, West Java, Indonesia | PT. Cikarang Listrindo |
11 | 2013 | HGPI GE Gas Turbine Unit #8, Mechanical Hot Gas Pat Unit #8 and Generator Inspection | Mechanical hot gas pat inspection gas turbine and generator inspection | Cikarang, West Java, Indonesia | PT. Cikarang Listrindo |
12 | 2012 | Alstom CAP 2012 – Gas Turbine-6B Combustion Inspection at Chandra Asri Petrochemical Cilegon plant | Gas turbine-6B combustion inspection | Cilegon, Banten, Indonesia | PT. Alstom PES Indonesia |
13 | 2012 | Alstom TP 2012 – M & E Rewinding Work Generator Stator and Field Inspection at Tanjung Priok Power Plant | M & E rewinding work generator stator and field | Tanjung Priok, North Jakarta, Indonesia | PT. Alstom PES Indonesia |
Year | Project Name | Job Description | Location | Client | |
---|---|---|---|---|---|
1 | On Going | AMMAN 1 x 450MW CCPP Project | EPC Works for Combine Cycle Power Plant | Sumbawa, West Nusa Tenggara, Indonesia | PT. Amman Mineral Nusa Tenggara |